Scope of Project
The facility was built in two phases. The first phase was a hot-rolling tube mill, along with several finishing lines, for the production of seamless tubes. Phase 2 included building an electric arc furnace for producing high quality steel on-site. The final finished facility will encompass more than 1.35 million square feet and be capable of producing up to 320,000 tons of steel tubes annually.
Services Provided by Middough
Middough was selected by the client as the EPC contractor for their new pipe mill.
Results Delivered to Client
As the EPC contractor, Middough performed preconstruction engineering for the tube rolling mill foundations, finishing mill process foundations, miscellaneous building foundations and scale pit foundations to assist in the initial development of the project probable costs.